How Much Does a Quantity Surveyor EDC or Cost Summary Report Cost in NSW?
Short answer: An Estimated Development Cost (EDC) report or council cost summary report prepared by an experienced quantity surveyor in NSW typically costs from $660 for a basic new house, rising to around $1,100 for large houses or more complex renovations. Larger, commercial and over $3 million projects are quoted individually. Most reports are completed in about three business days from receipt of the DA drawings, and the report should comply with NSW Planning Circular PS25-004 and your council's requirements.

What Is an EDC Report or Cost Summary Report?
An EDC report is an independent assessment of the estimated market cost of carrying out a proposed development. NSW councils and certifiers use it to determine the approval pathway, calculate assessment fees and apply DA requirements. It is commonly required for Development Applications (DA), Construction Certificates (CC), Complying Development Certificates (CDC) and Section 4.55 modifications.
The names vary by council. You may see it called an EDC report, a cost summary report, a QS report or a council cost report. For most residential projects they are the same type of document: a cost estimate prepared to the council's requirements.
How Much Does an EDC or Cost Summary Report Cost?
CPP Quantity Surveyors charges a fixed fee for each report. As a guide, fees including GST are:
Standard two-storey new house with minimal landscaping or site costs: from $660
Large houses and more complex renovations or alterations and additions: up to about $1,100
Duplexes, commercial, industrial, childcare and projects over $3 million: quoted individually
Quotes are fixed fee, with no obligation, and are often provided within hours of receiving the enquiry. Council lodgement fees are separate and are paid to council.
What Affects the Fee?
Project type and size. A single dwelling is quicker to assess than a multi-unit, commercial or mixed-use project.
Design complexity. Renovations, alterations and additions, and complex forms take more time than a simple new build.
Documentation. Clear, complete DA drawings speed things up. Missing or inconsistent information adds time.
Site conditions and external works. Significant landscaping, retaining walls, stormwater or civil works increase the scope to be costed.
Council requirements. Some councils require their own forms to be completed and signed.
Urgency. Expedited turnaround is available for many project types.
Project value. Projects over $3 million require the NSW standard form and a more detailed report.
What Does the Fee Include?
A compliant report from CPP includes:
The requirements set out in NSW Planning Circular PS25-004
An elemental cost summary prepared in line with Australian Institute of Quantity Surveyors (AIQS) guidelines
An outline of the methodology and the documents used
Council forms completed where required
The signing QS's credentials
What Is PS25-004 and Why Does It Matter?
NSW Planning Circular PS25-004 was issued in October 2025 by the Department of Planning, Housing and Infrastructure. It replaced the earlier circular PS 24-002 and introduced a single methodology for calculating estimated development cost, replacing the older "estimated cost of development" and "capital investment value" approaches. The core principle is that EDC must be based on a genuine estimate of the cost of carrying out the development.
In practice, this means a generic per-square-metre figure or an unverified online calculator output may not satisfy a council. A quantity surveyor who prepares these reports regularly and follows the AIQS practice standard can produce a compliant report efficiently, which is why fees can remain modest.
Does the Quantity Surveyor Need to Be AIQS Registered and a CQS?
The requirement depends on the project:
State significant development: the report must be signed by an AIQS Certified Quantity Surveyor (CQS) or an RICS Chartered Quantity Surveyor.
Other development over $3 million: the report must be prepared by a qualified quantity surveyor who is a member of a relevant professional body such as the AIQS or RICS, following the AIQS practice standard and the NSW standard form.
Projects under $3 million: requirements are set by each council. Some accept a cost estimate from a suitably qualified person, while others require a QS report once a council-specific threshold is passed. Examples include $500,000 for some Section 7.11 contribution reports, $1 million at Inner West and $2 million at Wollongong.
Even where it is not strictly mandatory, I recommend using an AIQS member who holds the CQS designation. CQS is the credential the Department itself names, and it gives councils and certifiers the greatest confidence in the figure. It reduces the risk of a council query, a request for a revised report, or a delay to your approval. CPP's reports are prepared and signed personally by Gary Uys FAIQS CQS.
How Long Does an EDC Report Take?
Most reports are completed in approximately 1-5 business days from receipt of the final DA drawings. Larger or more complex projects, including commercial developments and applications with extensive documentation, can take longer. If you are working to a lodgement deadline, expedited service is available. An indicative turnaround is confirmed in the fixed-fee quote.
What Information Do You Need to Provide?
Generally, the final DA drawings are enough. Depending on the project, supporting documents such as landscape plans, stormwater designs or civil drawings may also be needed. A site inspection is not usually required, because the report can be prepared from the drawings, consultant documents and satellite imagery.
Why the Cheapest Report Is Not Always the Cheapest Option
A report that a council queries, rejects or asks to be redone costs you time and money at the most time-sensitive point of your approval. Be cautious of very cheap or fully automated reports, particularly where the terms disclaim responsibility for accuracy. A report signed by a named, credentialled quantity surveyor carries professional accountability that an automated output does not.
Frequently Asked Questions
How much does an EDC report cost in NSW?
From $660 for a basic new house to about $1,100 for large houses or complex renovations when prepared by an experienced quantity surveyor. Larger and commercial projects are quoted individually.
What is the difference between an EDC report and a cost summary report?
The terms are often used interchangeably. "EDC" is the term used in NSW planning legislation. "Cost summary report" is the name many councils use for the form lodged with a DA. Councils may require different forms, and a QS completes the one your council asks for.
Do I need a quantity surveyor for my DA cost report?
Not always. For lower-value projects many councils accept an estimate from a suitably qualified person, such as a licensed builder, registered architect or qualified building estimator. Above council-specific thresholds, and for projects over $3 million, an independent QS report is required. Check your council's requirements before lodging.
Does the quantity surveyor need to be a CQS?
For state significant projects, yes: the report must be signed by an AIQS Certified QS or RICS Chartered QS. For projects over $3 million, the QS must be a member of a relevant professional body such as the AIQS or RICS. For smaller projects it depends on the council, but a CQS gives the greatest assurance of acceptance.
How long does an EDC report take?
Around 1-5 business days for most reports, with longer for complex projects. Expedited service is available.
How long is an EDC report valid?
For projects over $3 million, the NSW standard form requires the report to be dated no earlier than 30 days before the application is lodged. For other projects, confirm the requirement with your council.
Do you need to visit the site?
Usually no. Most reports are prepared from the DA drawings and supporting documents.
Get a Fixed-Fee EDC or Cost Summary Report Quote
CPP Quantity Surveyors prepares independent EDC reports and council cost summary reports for homeowners, architects, designers, town planners and builders across Sydney and Regional NSW. To get a fixed-fee quote, call (02) 9629 3495, email contact@cppqs.com.au or use the Request a Quote.
By Gary Uys, FAIQS CQS, Director - CPP Quantity Surveyors